Between 11:00 and 14:00 on February 25, the Danube Bridge will be closed at short intervals to all vehicles.
Major repairs to the Danube Bridge continue on schedule
Due to heavy traffic across the structure, the old and unrepaired road surface has deteriorated, and works are now being carried out to ensure traffic safety.
During the works, all vehicles will be required to wait in place.
Central Election Commission: With 7.37% of Polling Station Protocols Processed, Iotova and Gyurov Head to a Run-off in Presidential Election on 1 November
ЦИК при обработени 100% протоколи от чужбина: Гюров печели вота в чужбина, Йотова остава втора
Исторически избори в Сърбия: Студентите влизат в парламента, Вучич призна поражението си